Test phase in the frame of the COPS/TRACKS field campaign with basis in Friedrichshafen

Working environment
Meteo boom
ZEBIS-Rack after the certification
Backbord-view of Zeppelin NT
Backbord-Rotor
ZEBIS-Rack shortly before installation
Montage of the Rack ground attachment
Integration of the ZEBIS-Rack into the gondola
Without words!
Marc Krebsbach preparing the modules
Prepared modules
Module connection inside the rack
View from outside: ZEBIS-Rack inside the gondola
Inside view: ZEBIS-Rack inside the gondola
Inlet tubing of ZEBIS
Roll-out of the Zeppelin NT (1)
Roll-out of the Zeppelin NT (2)
Roll-out of the Zeppelin NT (3)
Mast-Truck
Reflection (1)
Reflection (2)
Take-off of the Zeppelin NT (1)
Take-off of the Zeppelin NT (2)
Take-off of the Zeppelin NT (3)
Intermediate landing (1)
Intermediate landing (2)
DIMONA (1)
DIMONA (2)
View into the gondola (1)
View into the gondola (2)